What should a turned-parts inspection checklist include?
- Drawing and revision: use the same approved revision for the part, inspection plan and any sample reference.
- Material and treatment: state the grade, condition and any certificates or treatment records required.
- Functional dimensions: list the relevant bores, outside diameters, shoulders, lengths and limits. Identify datums and measurement positions.
- Threads and mating features: specify the thread callout and agreed gauge or mating-part checks.
- Surface and edges: define finish, burr control, chamfers and surfaces requiring protection.
- Acceptance records: agree equipment, sampling, reported dimensions, batch identification and how deviations will be reviewed.
For stepped shafts, start with mating diameters and locating shoulders. For bushings and sleeves, identify the bore, outside diameter and wall requirements. For threaded components, include the thread and functional fit requirements.
See the shaft worksheet example, or use the quotation checklist to include these requirements in your enquiry.
Inspection planning · FG-DS-001
Link each shaft feature to a check and a record
Use the same drawing revision for the CAD model, sample review and inspection plan. The worksheet below lists the requirements to agree; measured results are left blank.
| Feature | Reference size | Agree before checking |
|---|---|---|
| Mating section | Ø16 mm | Limits, measurement positions, equipment and sampling. |
| Locating shoulder | X = 48 mm | Datum, position and face requirements, measurement method. |
| Axial dimensions | 120 mm overall; 28 / 20 / 44 / 28 mm sections | Applicable limits and dimensions to record. |
| End connection | Ø10 × 28 mm blank | Final thread callout, gauge or mating-part acceptance. |
| Edges and appearance | Both end edges C0.5 | Burr limits, finish and surface protection. |
Incoming material checks
Material requirements should match the drawing and quotation. Certificates can be discussed where the project requires them.
First-article inspection
The first completed parts should be reviewed against critical dimensions, threads, appearance and functional requirements before the batch continues.
In-process and final checks
Patrol inspection and final review help identify dimensional drift, appearance issues and packing risks before shipment.
Useful inspection information
- Critical dimensions marked on the drawing
- Thread gauge and fit requirements
- Approved sample or appearance reference
- Batch records and reports requested before production
Inspection should match the risk
Different features may need different inspection levels. Functional fits, threads, sealing faces, visible surfaces and assembly-critical dimensions should receive more attention than non-critical surfaces. Clear inspection priorities help keep the process practical.
Appearance and packing review
For CNC turned components, quality includes dimensions, appearance and arrival condition. Burrs, sharp edges, scratches, plating appearance and packing protection can affect whether the parts are usable on arrival. If appearance is important, an approved sample or photo reference should be shared.
Reports and communication
If inspection records, material certificates or photos are required before shipment, this should be agreed before production. That prevents delays at the end of the order and keeps batch approval clearer.

